Completed 2009 – US$80,000 New 2 Classroom Building, Refurbishment of 3 Classroom Building, Insulation and Ventilation of 2 Classroom Building, Renovation of Toilets and Connection of Water Supply
Bruce, Simon and I went back to Ostico School today. The children weren’t in school (I think an unofficial holiday had been declared to clean up after the previous days’
I had no real idea what to expect of the school opening. But it was an incredible day. Stephen and I travelled to Ostico with Kirsty – it was wonderful
Stephen and I are here. After over a year of thinking about East Timor, we’ve finally arrived. It was a glorious flight from Darwin, with the sun just coming up
As a mother who has spent a lot of time on planes with small children, I have endured many humiliations. Today was a new addition to the long list however.
Well Ostico School is finished and from all reports is better than we could have hoped for! It was looking this week like the Prime Minister, Xanana Gusmao, would be